AlburyCity
Ceres Drive Pump Station
Albury NSW 2640
This project involved construction a main pump well with a depth of ten metres and 4 metre diameter. Associated with this main chamber was a valve pit, flow meter pit manholes, rising main and sewer trunk mains with depths exceeding 5.5 metres.
A point of interest was the water table for this project was at 6.5 metres.
This project was completed in Sept 2015.
Referee:
Mr Ian Redman
[email protected]
Phone: 0437 763 722
2015
Construction Date
10 m
Depth
6.5 m
Water Table